- Home
- City Services
- Departments
- Building
- Wheaton Code Amendments
- 2018 International Plumbing Code Amendments
The ICC International Plumbing Code/2018 Chapter 1 Scope and Administration, Chapter 2 Definitions, Chapter 3 General Regulations, Chapter 11, Storm Drainage, with referenced standards and Appendix B as published by the International Code Council, Inc., together with the additions, insertions, deletions, and changes prescribed in this article, is hereby adopted by reference and made a part of this article. In the event that there is a conflict of codes between the Illinois State Plumbing Code and the ICC Plumbing Code Chapters 1,2,3, and 11, the State of Illinois Plumbing Code shall take precedence. (Ord. No. O-2020-05, § 1, 2-3-20)
The following sections or subsections of the International Plumbing Code are amended as indicated:
Section 106.6 Fees. Change to read: Fees shall be paid in accordance with the Wheaton City Code, appendix B, fee schedule.
Section 108 Violation Penalties. Change to read: See Wheaton City Code, section 22-3, violations; penalties.
Section 109 Means of Appeals. Change to read: Any references to the means/board of appeal shall comply with Wheaton City Code, section 22-12, means/board of appeals.
2/23/2023