2017 Road Construction and Maintenance

Listed below are the streets that will be under construction this year, along with the type of work being performed and status updates. This information is updated frequently during the construction season. Status dates are estimated and could be affected by weather or other unforeseen circumstances. To see the list of streets for which improvements are planned over the next five years visit the Five-Year Annual Road Program.

Projects are listed under the type of work planned for that area. The first three sections are part of the Engineering Department’s annual road improvement program. The last section – road maintenance – involves routine road maintenance overseen by the Public Works Department.

  • Street Reconstruction is the most extensive type of project, where crews remove the pavement, the base below it and sometimes the curb, too.
  • Street Rehabilitation removes and replaces the curb, followed by resurfacing the entire pavement surface.
  • Street Resurfacing involves grinding the existing pavement to accommodate a pavement overlay.
  • Road maintenance includes patching; partial resurfacing; correcting potholes and surface defects; and some pavement resurfacing, which includes milling (removing existing pavement) and paving (placing new pavement).

See a map of this year’s street reconstruction, rehabilitation and resurfacing projects.

STREET
CONSTRUCTION LIMITS
CURRENT STATUS

 RECONSTRUCTION
Crescent Street
Chase St. to President St.
TBD
 REHABILITATION
Farnham Lane
Naperville Rd. to President St.
TBD
 RESURFACING - SUBDIVISIONS
 Arrowhead Units 5 & 6
Barger Court
Wingate Ct. to Cul-De-Sac
TBD
Chippewa Court
Cul-De Sac to 141 Ft South of Seneca Dr.
TBD
Embden Lane
Milton Township Limits to Seneca Dr.
TBD
Keim Drive
Cul-De-Sac to 141 Ft South of Seneca Dr.
TBD
Menomini Lane
Milton Township Limits to Wingate Ct.
TBD
Stonegate Lane
Wingate Ct. to Weisbrook Rd.
TBD
Wingate Court
Menomini Ln. to Stonegate Ln.
TBD
 RESURFACING
Beecher Avenue
East Leg Graf Park to Birch Dr.
Road Work tentatively scheduled for Week of April 24
Belleau Woods Court
Belleau Woods Dr. to Cul-De-Sac
TBD
Birch Drive
Beecher Ave. to Manchester Rd.
Road Work tentatively scheduled for Week of April 24
Campbell Avenue
Illinois St. to Cul-De-Sac
Spot Curb replacement week of April 17
Carlton Avenue
North Intersection at Route 38
TBD
Evergreen Street
President St. to Ott St.
Spot Curb replacement week of April 17
Gary Court
Oak St. to Harrison Ave.
TBD
Hazelton Avenue
Childs St. to Manchester Rd.
TBD
Howard Circle
Howard St. to Cul-De-Sac
TBD
Howard Street *
Harrison Ave. to Howard Cir.
TBD
Lorraine Road
North and South Intersections at Route 38.
TBD
Lyford Lane
Aurora Way to Gables Blvd.
TBD
Naperville Road *
Route 38 to Willow Ave.
TBD
North Path
Blanchard St. to Pick St.
Spot Curb replacement week of April 17
Park Avenue *
Warrenville Rd. to Dead End
TBD
Pick Street
North Path to Harrison Ave.
Spot Curb replacement week of April 17
Plamondon Court *
Plamondon Rd. to Cul-De-Sac
TBD
Stoddard Avenue
Geneva Rd. to Hawthorne Blvd.
Spot Curb replacement week of April 17
Summit Street
Geneva Rd. to Hawthorne Blvd.
Spot Curb replacement week of April 17
Summit Street
Illinois St. to Harwarden St.
Spot Curb replacement week of April 17
Westwood Road
Beecher Ave. to Manchester Rd.
Road Work tentatively scheduled for Week of April 24
 WATER MAIN CONSTRUCTION
County Farm Road *
Manchester Rd. to County Complex Entrance
TBD
 MAINTENANCE
Aurora Way
Childs St. to Lakeside Dr.
TBD
Blanchard St.
College Ave. to Harrison Ave.
TBD
Butterfield Ridge
Subdivision - Units 1-9
TBD
Childs Street
Erie St. to Clinton Ct.
TBD
Circle Avenue
Carlton St. to Carlton St.
TBD
College Lane South
Briarcliffe Blvd. to Lancaster Ln.
TBD
Cross Street
Prairie Ave. to Dead End
TBD
Delles Road
Roosevelt Rd. to Arbor Ave.
TBD
Elm Street
Greenwood Dr. to Aurora Way
TBD
Franklin Street
Gary Ave. to Carlton St.
TBD
Gables Boulevard
Commerce Dr. to Childs St.
TBD
Gables Boulevard
Roosevelt Rd. to Foothill Dr.
TBD
Greenwood Drive
Elm St. to Lynwood Ln.
TBD
Hale Street
Illinois St. to Willow Ave.
TBD
Hevern Drive
West Cul-De-Sac to East Cul-De-Sac
TBD
Howard Street
Cul-De-Sac to Butt Joint
TBD
Irving Avenue
Harrison Ave. to Jefferson Ave.
TBD
Jefferson Avenue
Carlton St. to Ellis Ave.
TBD
Liberty Drive
Blanchard St. to Lorraine Rd.
TBD
Western Avenue
Lincoln Ave. to Bridge St.
TBD
Lois Lane
Pin Oak Ct. to St. Francis Ct.
TBD
Lowden Avenue
Blanchard St. to President St.
TBD
Lynwood Lane
Delles Rd. to Greenwood Dr.
TBD
Lyon Avenue
Union Ave. to Dead-End
TBD
Madison Avenue
Cross St. to Irving Ave.
TBD
Madison Avenue
Carlton St. to Ellis Ave.
TBD
Martingale Road
Bridle Ln. to Driving Park Rd.
TBD
Pin Oak Ct.
Lois Ln. to Stonebridge Trl.
TBD
Prairie Avenue
President St. to Summit St.
TBD
Ranch Road
Driving Park Rd. to Howard Ct.
TBD
St. Francis Ct.
Lois Ln. to Stonebridge Trl.
TBD
Stonebridge Trail
Wiesbrook Rd. to Creekside Dr.
TBD
Stuarton Drive
Carrol Gate Rd. to Cul-De-Sac
TBD
Union Ave.
Western Ave. to End
TBD
Western Avenue
Union to Ave. to Lincoln Ave.
TBD
Winner's Cup Circle
Brighton Dr. to Brighton Dr.
TBD

* water main work included on these streets – extends construction time.

If you have questions about the annual road improvement program, please call the Engineering Department at 630-260-2065.  Or if you have questions about the road maintenance program, please call the Public Works Department at 630-260-2116.